Powering the AI Revolution: Using OMDDMS® to Navigate the Complex Journey of SMR Deployment for Data Centres

As Rolls-Royce prepares to power AI data centres with Small Modular Reactors, the challenge isn't technology; it is operating model design and delivery. OMDDMS® provides the framework to achieve this transformation successfully.
Austin Merrett
Co-Creator of OMDDMS® | Founder, Oliver Swift

SMR Deployment for Data Centres

The convergence of two transformative technologies is creating one of the most exciting infrastructure challenges of our time: powering artificial intelligence data centres with Small Modular Reactors.

With Rolls-Royce positioning itself to become the first UK firm to use nuclear power for AI operations through Small Modular Reactors, and the UK government backing the aerospace giant to build the country's first small modular nuclear reactors following a two-year selection process, the question is no longer if this will happen, but how organisations can successfully design, build, and deliver such complex transformations.

The Scale of the Challenge

The numbers are staggering.

945 TWh Annual AI Data Centre Energy by 2030
470 MW Energy per Rolls-Royce SMR
£2.5bn UK Government Commitment
3,000 Jobs to be Created

According to industry analysis, AI data centres will consume 945 terawatt-hours annually by 2030, equivalent to the entire electricity consumption of Japan. Traditional power sources cannot meet this demand while maintaining the 24/7 carbon-free reliability required by modern data centres.

Each Rolls-Royce SMR will generate enough energy to power one million homes for a minimum of 60 years whilst producing no carbon emissions during operation. The company reports its SMRs will produce 470 megawatts of low-carbon energy, equivalent to the output of 150 onshore wind turbines.

The UK government's commitment is significant: £2.5 billion for SMRs over three years to build three SMR units with a combined output of about 1.5 gigawatts. The UK government has indicated these plans could support up to 3,000 jobs and power the equivalent of 3 million homes once the SMRs are connected to the grid in the mid-2030s.

Yet the promise comes with profound complexity.

The Unprecedented Challenges

Building an SMR-powered data centre represents what many would call a "first of a kind" (FOAK) transformation, and the challenges are formidable:

Regulatory and Timeline Complexity

Data centre companies face five-to-seven-year permitting and construction timelines for nuclear facilities, whereas SMRs are generally considered FOAK projects, as the novelty of their designs often means they are untested, leading to design uncertainty and ultimately, construction, commissioning, and operational risks. The regulatory landscape is evolving rapidly, but organisations cannot afford to wait; they must navigate current frameworks while preparing for future changes.

Technical Integration Hurdles

Integrating SMRs into the existing ecosystem will be complex, requiring specialised expertise to navigate everything from high-density GPU deployments consuming hundreds of kilowatts per rack to sophisticated liquid cooling systems managing extreme heat loads. This isn't simply about connecting a power source to a building; it's about creating an integrated operational ecosystem.

Supply Chain and Workforce Gaps

Supply chain development requires rebuilding nuclear manufacturing capabilities that have been dormant for decades, and workforce training must accelerate to provide the specialised skills needed for SMR construction and operation. The sector suffers from an eroded nuclear supply chain, following a hiatus in nuclear construction during the 1980s and 1990s.

Stakeholder Complexity

Establishing an SMR-based scheme requires multiple stakeholders, including local communities and regulatory bodies, to collaborate closely. The number of interdependencies is unprecedented: nuclear regulators, energy authorities, data centre operators, construction partners, local communities, and technology providers must all align.

Learn the OMDDMS® Framework

Discover how to design operating models that navigate unprecedented complexity in nuclear-digital infrastructure.

Foundation Course Practitioner Course

Where Traditional Approaches Fall Short

Most organisations approach these challenges through conventional project management frameworks. They create Gantt charts, define work packages, and hope for the best.

But here's the problem: they're trying to manage a fundamental operating model transformation using tools designed for discrete projects.

When you're building an SMR-powered data centre, you're not just constructing infrastructure, you are transforming:

  • Capabilities: From traditional grid-connected operations to integrated nuclear-powered systems
  • Processes: Entirely new operational, safety, and maintenance procedures
  • People: New roles, skills, and organisational structures
  • Information: Novel data flows between nuclear operations and data centre management
  • Technologies: Unprecedented integration of nuclear and digital infrastructure
  • Governance: Multi-jurisdictional regulatory compliance frameworks
  • Organisational structures: New entities bridging nuclear and technology sectors

Sound familiar? This is precisely what an operating model transformation looks like, and it's exactly where OMDDMS® (Operating Model Design, Delivery, and Management Standard) becomes invaluable.

How OMDDMS® Addresses SMR-Data Centre Challenges

The OMDDMS® framework provides a structured methodology specifically designed for operating model transformation of this scale and complexity. Here's how it directly addresses the SMR-data centre challenge:

Comprehensive Scope Definition

OMDDMS® begins with the Scope phase, which is critical when you're dealing with unprecedented complexity. Rather than diving into design, you first establish:

  • The boundaries of change across nuclear, data centre, and operational domains
  • High-level requirements that integrate regulatory, technical, and commercial needs
  • Preliminary assessment of required capabilities and resources
  • Sponsor and Operating Model Board structure to manage multi-stakeholder complexity

For an SMR-data centre project, this means clearly defining where nuclear operations end and data centre operations begin, what shared capabilities are needed, and how governance will function across traditionally separate domains.

Baseline and Gap Analysis

SMRs are promoted as offering significantly reduced construction times and costs compared to their traditional counterparts, mainly due to factory/yard manufacturing, which lowers exposure to certain construction interruptions, but only if your operating model can leverage this advantage. OMDDMS® helps you understand whether you're ready.

The Analyse phase of OMDDMS® enables organisations to conduct a thorough assessment of their current capabilities versus what's required:

  • Assessing existing data centre operational capabilities against nuclear-ready requirements
  • Identifying workforce gaps in both nuclear and advanced cooling technologies
  • Evaluating supply chain readiness for modular nuclear construction
  • Understanding regulatory compliance gaps across multiple jurisdictions

Structured Design Approach

The Design phase is where OMDDMS® truly differentiates itself. Rather than creating isolated technical designs, it provides a framework for designing the entire operating model and how your organisation will operate once the SMR data centre is live.

OMDDMS® explicitly recognises that multiple design methodologies can be employed:

  • Human-centred design: Essential for creating operational roles that safely bridge nuclear and data centre operations
  • Service design: Critical for defining how energy supply interacts with data centre loads
  • Customer-centric design: Vital when your "customers" include both end-users and regulatory bodies

For SMR data centres, this means designing:

  • How shift operations will function with nuclear safety protocols
  • How maintenance windows will be coordinated between reactor refuelling cycles and server maintenance
  • How emergency response procedures will integrate nuclear safety with data continuity
  • How performance monitoring will span from reactor metrics to computational loads

The Configurable Organisation Concept

This is perhaps OMDDMS's most powerful contribution to the SMR data centre challenge. Rather than attempting a "Big Bang" transformation, which would be catastrophic for this type of project, OMDDMS® advocates for the Configurable Organisation.

Because SMRs have simpler designs and can be manufactured in factories, they can be shipped in a few significant parts, resulting in significantly reduced on-site construction times. Once SMRs start to come online, many are confident that subsequent reactors will be built more quickly and inexpensively.

This is critical because data centre companies must begin securing permits, ground space, and operational expertise to prepare for SMRs to become scalable and repeatable by the 2030s. You cannot wait until the construction is complete to start building these capabilities.

The Configurable Organisation enables you to:

  • Phase the transition from traditional grid-connected operations to partial SMR power to full SMR reliance
  • Test operational procedures at a smaller scale before full deployment
  • Build workforce capabilities progressively as the project advances
  • Adjust governance structures as regulatory clarity emerges

Risk-Managed Transition Planning

The OMDDMS® framework explicitly addresses transition planning, not just what the target state looks like, but how you get there safely.

For SMR data centres, this means:

  • Phased capability building that aligns with construction milestones
  • Risk management that spans nuclear safety, operational continuity, and commercial viability
  • Stakeholder management that maintains confidence through a multi-year transformation
  • Governance that adapts as the project moves from design through construction to operation

Transform Your Operating Model the OMDDMS® Way

Learn the seven-phase methodology that prevents value destruction and builds sustainable transformation capability.

Book Your Course Now Schedule a Consultation

Integrated Governance Framework

The projects will be "first of a kind" (FOAK) and increased construction costs and delays ought to be expected, meaning that achieving a balanced legal framework from the outset will be important.

OMDDMS® provides structured governance through the Operating Model Board concept; a cross-functional body that can make decisions spanning nuclear, technology, commercial, and regulatory domains, essential when you need to balance:

  • Nuclear regulatory requirements (Office for Nuclear Regulations)
  • Data Centre operational standards (Uptime Institute)
  • Environmental Compliance (Environment Agency)
  • Energy Market Obligations (Ofgem)
  • Commercial viability (investors, customers)

Sustained Monitoring and Adoption

The Monitor phase of OMDDMS® ensures the operating model changes are effective and sustained.

For SMR data centres, this means:

  • Continuous assessment of operational performance against design intent
  • Early detection of operating model drift or emerging issues
  • Structured feedback loops to drive improvement
  • Evidence that the operating model is delivering the intended strategy

Real World Application: A Rolls-Royce SMR Data Centre Scenario

Let's make this concrete.

Imagine you're leading the deployment of a 470MW Rolls-Royce SMR to power a hyperscale data centre.

Without OMDDMS®

You'd likely treat this as two parallel projects: build the SMR, create the data centre, then connect them at the end. You'd likely encounter integration issues late, unexpected operational conflicts, and struggle with unclear governance, potentially facing delays as different stakeholder groups work at cross-purposes.

With OMDDMS®

Scope Phase: You establish that this is fundamentally an operating model transformation requiring new capabilities spanning nuclear operations, advanced cooling, regulatory compliance, and integrated energy management. You identify the Operating Model Board (OMB) membership (nuclear operations, data centre operations, regulatory affairs, commercial, safety) and establish their decision-making authority.

Discover Phase: SMR data centre projects require building entirely new infrastructure from the ground up. The Discover Phase identifies the organisational capabilities, market requirements, regulatory landscapes, and ecosystem partnerships needed to operate a facility that doesn't yet exist.

Analyse Phase: You conduct the Operating Model Maturity Assessment. This identifies that while your organisation has strong data centre operations capability, you have critical gaps in nuclear safety culture, supply chain assessment, internal leadership, transition planning, and technology focus.

Design Phase: You develop the Target Operating Model based on your analysis findings. This creates the blueprint for how your organisation will function, addressing the critical gaps identified and building the structures needed for success.

Transition Phase: The Transition Phase transitions the SMR data centre transformation from design to reality. You're orchestrating nuclear operations with AI computational infrastructure while maintaining 24/7 uptime. With timelines of five to seven years and zero tolerance for downtime, execution demands unprecedented precision.

Monitor Phase: You establish performance metrics spanning nuclear safety, energy reliability, computational availability, and commercial performance, ensuring the operating model delivers the intended strategic benefits.

Govern Phase: The continuous framework ensures your SMR data centre transformation stays coordinated, compliant, and effective throughout the multi-year journey.

The Strategic Advantage

The Institute for Global Change supports the SMR approach for long-term energy planning, saying SMRs can be a cornerstone of the long-term, secure and low-cost decarbonised energy system that can power the future economy.

But realising this vision requires more than good technology; it requires excellent operating model design and delivery.

Organisations that apply OMDDMS® to SMR-data centre deployment will gain:

Faster Time to Value

By planning the operating model transformation in parallel with infrastructure build, you avoid the costly "now what?" moment when construction completes but the organisation isn't ready to operate.

Reduced Risk

Structured risk management across technical, operational, regulatory, and commercial domains results in fewer surprises and enhanced stakeholder confidence.

Competitive Advantage

The SMR fleet could contribute up to £54 billion to the UK economy between 2025 and 2050, with production of the three SMR plants forecast to create 40,000 regional UK jobs by 2050. First movers who can successfully deploy will capture disproportionate value.

Configurable Future

The Configurable Organisation concept means you're not locked into rigid structures. As SMR technology matures, regulatory frameworks evolve, and data centre demands shift, your operating model can adapt.

Regulatory Confidence

Demonstrating a structured and governed transformation builds confidence with nuclear regulators, energy authorities, and other stakeholders, potentially accelerating approvals.

The Forward Path

The UK government intends to sign a contract with Rolls-Royce SMR and allocate a site later this year, subject to regulatory approval, with the first units expected to connect to the grid in the mid-2030s.

The window for organisations to prepare is now. Those who treat SMR-data centre deployment as simply an infrastructure project will struggle. Those who recognise it as an operating model transformation and apply frameworks like OMDDMS® will thrive.

The question isn't whether SMRs will power tomorrow's data centres. The convergence of forces driving SMR adoption appears unstoppable, with tech companies' insatiable power demands, net-zero commitments by 2030-2040, and grid infrastructure limitations creating a perfect storm favouring nuclear solutions.

The question is whether your organisation has the operating model capability to make it happen successfully.

Build Transformation Capability Before the Crisis

Energy and infrastructure leaders: Assess your operating model risk now.

Foundation Course Practitioner Course Combined Programme

References

  • AI Magazine (2025) 'Why Rolls-Royce is Using Nuclear Power for AI Data Centres', AI Magazine, 21 August. Available at: https://aimagazine.com/news/smrs-how-rolls-royce-will-use-nuclear-to-power-ai
  • Carbon Credits (2025) 'UK Bets on Rolls-Royce For Its First Small Modular Nuclear Reactors With £2.5B Pledge', Carbon Credits, 11 June. Available at: https://carboncredits.com/uk-bets-on-rolls-royce-for-its-first-small-modular-nuclear-reactors-with-2-5b-pledge/
  • CNBC (2025) 'Aerospace giant Rolls-Royce to build Britain's first small modular nuclear reactors', CNBC, 10 June. Available at: https://www.cnbc.com/2025/06/10/rolls-royce-to-build-britains-first-small-modular-nuclear-reactors.html
  • Data Center Dynamics (2024) 'Nuclear power and SMRs: the solution to data center energy woes?', Data Center Dynamics, 14 November. Available at: https://www.datacenterdynamics.com/en/analysis/nuclear-power-smr-us/
  • Data Center Knowledge (2025) 'Nuclear-Powered Data Centers: When Will SMRs Finally Take Off?', Data Center Knowledge, 24 January. Available at: https://www.datacenterknowledge.com/energy-power-supply/nuclear-powered-data-centers-when-will-smrs-finally-take-off
  • Herbert Smith Freehills Kramer (2025) 'From procurement to construction: Key risks and challenges in SMR deployment in the UK', Herbert Smith Freehills, 7 July. Available at: https://www.hsfkramer.com/notes/construction/2025-posts/from-procurement-to-construction-key-risks-and-challenges-in-smr-depolyment-in-the-uk
  • Intelligent Data Centres (2025) 'Editor's question: Powering tomorrow's data centres – are SMRs the game-changer?', Intelligent Data Centres, 15 July. Available at: https://www.intelligentdatacentres.com/2025/07/15/editors-question-powering-tomorrows-data-centres-are-smrs-the-game-changer/
  • Introl (2025) 'Small Modular Nuclear Reactors Power the AI Revolution 2025', Introl Blog, 8 August. Available at: https://introl.com/blog/smr-nuclear-power-ai-data-centers-2025
  • Nuclear Engineering International (2024) 'Data centres and SMRs: Dream ticket?', Nuclear Engineering International, 22 May. Available at: https://www.neimagazine.com/nuclear-markets/data-centres-and-smrs-dream-ticket/
  • Rolls-Royce SMR (2025) 'To Deliver Clean, Affordable Energy For All', Rolls-Royce SMR. Available at: https://www.rolls-royce-smr.com/

About the Author

Austin Merrett is Co-Creator of OMDDMS® (Operating Model Design, Delivery, and Management Standard) and Founder of Oliver Swift, one of only two globally accredited OMDDMS® training organisations.

With over two decades of experience leading operating model transformations across financial services, energy, and government sectors, Austin specialises in helping FTSE 250 companies navigate complex, high-stakes change.

Oliver Swift is one of only two OMDDMS® Accredited Training Organisations globally, headquartered in The City of London and serving the UK, Europe, Africa, and the United States.

Download PDF Version